16 Jan 2015 --- Reengineering work at the Beaucaire site with, in particular, the establishment of 2 high-performance bottling lines in place of the 6 existing lines, resulted in an increase in the plant's productivity. An intervention which brought 3 Gebo Cermex areas of expertise into play: engineering of packaging lines, supply of packaging machines and integration of complementary systems selected from other equipment suppliers.