Tetra Pak Makes Further Investments in Lund
Energy efficiency and environmental awareness will form the focal points in the construction of the new buildings.
12/05/07 Tetra Pak, one of the world’s leading suppliers of processing and packaging equipment to the food industry, has decided to invest €32.6 million in two new buildings in Lund. The buildings are scheduled to be built at the Råbyholm estate.
“This investment provides us with flexible premises for such units as our R&D Department. This input will more than meet our future requirements on premises so that we can raise productivity in both development and production,” says Dennis Jönsson, President & CEO Tetra Pak Group.
The premises, with a floor space of 13 thousand square metres, will accommodate 430 workplaces and a machine hall of five thousand square metres. Construction is planned to begin at the turn of 2007/08 and will reach completion at the end of 2009. Energy efficiency and environmental awareness will form the focal points in the construction of the new buildings.
“As a result of this investment, every potential will be created for us to strengthen our position as the technological centre of the Tetra Pak Group,” rounds off Göran Harrysson, Managing Director AB Tetra Pak.